Date: March 15 - May 19, 2026
Back at a workday at The Land in California I'd had the opportunity to lay a few tiles on a bathroom floor and thought "this isn't so hard!." My first every tradesman-hiring experience was to get the tub enclosure of our tiny Santa Fe house tiled in 1982, and I'd hired out this aspect of my DIY projects ever since. So I decided for this project I'd do the tiling myself. As a side benefit I was able to go shopping for new tools including a wet saw for cutting tiles, diamond edge hole saws, and various implements for mixing, holding and pushing mortar & grout around, and yet more tools for getting rid of it (i.e. clean-up). Fortunately we live in the time of cheap Chinese tools because tile saws can be had for a bit over $100.
Ignorant as always, I asked the drywall guy if it was cool to cement tiles directly on to the blue sheetrock for the tub/shower enclosure. It is water-resistant after all. He said no, don't do that. They make this rubbery sealant you can brunsh on first, but better yet is the waterproofing fabric stuff used as an underlayment. I went to YouTube and found demonstrations of the use of various brands and decided I'd use the "Schluter Kerdi system" which looked like the highest quality option. It took some searching at the big box stores but eventually I found all the fabric elements and plain old-fashioned mortar required.
Even though my shoulder was getting worse, and I knew working with mortar on the wall would be painful, I jumped in. It was seriously challenging to do as a one-man job because the old style mortar doesn't stay soft for that long, and the whole point is to stick the fabric to the drywall, straight and level, with no bubbles, with minimum joints so there won't be anywhere for the water to get through.
Here is my starting state. You can see the three bath/shower penetrations in the head wall.

Got the lower run done with some trouble but it adhered well...
but the upper layer was touch-and-go in terms of adherence. It definitely didn't meet my quality standards but I did as good as I could before the mortar set, moistening the fabric and running the trowel over it, keeping my fingers crossed that it would stay put when we stuck tiles to it!
Also there is a lip around the top of the cast iron tub and I want the fabric to shed over that lip so water doesn't go behind tub. There must be a correct way to get the fabric to be vertical and land inside the tub edge, but I still haven't figured out what that is. Perhaps you are supposed to have drywall end at the tub edge instead of the way I did it, which is to run it down to the floor and push the tub against it. At any rate I had a few scraps of the Kerdi cloth left over so I built up a second layer to smooth the step into the tub:

About this time I got the diagnosis from the surgeon at the Carolina Hand and Sports clinic that my rotator cuff was 85% torn through, and my bicep tendon was in bad shape too. So I scheduled surgery for April 8. Meanwhile, on March 22 I took a very memorable trek with Zach D. from Mars Hill to our house, walking the ridge line the whole way.
An eighteen mile hike was way past my limit, but I'd wanted to do this walk ever since moving here so I couldn't pass it up when Zach suggested it. It was literally a staggering experience by the time I got over Zade's Knob behind our house. When Zach saw the bathroom project, he offered to come help with tiling since my shoulder was an impediment.
The following Sunday (March 29) he came over and we got the first course of tiles in on the sides and two courses done in the back of the shower enclosure.
The tile store in Asheville was submerged by the Swannanoa River during Hurricane Helene, but they had pulled the pallets of tile out of the mud and were selling it all at a discount. It was lucky that the dirty stock included boxes of the brick-like floor tiles we used in the house because that's what I wanted to use for this bathroom too. For the wall tiles I went back and pawed through the entire warehouse and selected one that I thought would work. Water, a brush, and a little elbow (shoulder?) grease and they cleaned up nicely.
The other concern was how to finish the edge. They didn't have any bull-nose tile that matched. Instead they recommended these aluminum trim edges so I bought the color the guy recommended suitable for the tiles. Here is a picture from the start of work on April 2nd - me now working by myself - it's easier once you can extend up from the existing courses:
You can see above the edge piece has to go in first so it gets embedded in the tile mortar. It was hard to make it stay put so I rigged up some wood to give an edge to wedge it against. The edges are also needed around the window.
It was clear from the first courses that the tile on the head wall was going to be way out from the drywall, so I installed a chuck of cement board so I wouldn't have to try to fill the gap with mortar:
Below you can see the little plastic spacers that get placed between the tiles - this keeps everything even. You can leave those in until the mortar sets then break them out. The white "thin-set" mortar is much easier to work with than the plain old cement mortar that was required beneath the Kerdi cloth.
Another technique recommended on YouTube was to lay out all your tiles on the floor first so you select which tiles go next to which, and hopefully place the uglier parts into areas that get less focus.
Another session on April 3rd brought me up around the window. I'm afraid the walls were creeping inwards as I kept the balance between laying tiles vertically and keeping the faces of the tiles in one plane. You can see that creep clearly in the wedge shape of the mortar between the edge piece and the sheetrock corner on the right of this picture:
Another view of the same from the next morning.

April 4th I made the final push to the top:

And two days later I tackled the grouting:

All the while trying to keep the stuff out of the bathtub!
The day before surgery it's all clean and kind-of tidy:

Back from surgery on the 8th, arm in a sling:
Can't work, but I can carry my phone around to enjoy what's been done:
Son George had mentioned how great the floor heat was in his bathroom, so I decided I'd add that to the bathroom features. After a bunch of YouTube research and online shopping, I selected a kit that provided the heating element and thermostat control. You buy it based on the square footage and I found a size the would heat most of the floor but not under the to-be-installed vanity and not right around the toilet (which is forbidden because you can melt the toilet seal wax). I had to buy another tool: the hot glue gun I've never owned - oh boy!
On April 17th I tackled the floor. Here is the heating coils laid out (black wire which comes embedded in the orange plastic spacing grid):

You can see its a bit flatter after being glued down:
I had installed conduit behind the sheetrock so I could pull the wires up to the chest high electrical box next to the door. I fished the wire by tying a small screw on the end of a string which provided the weight needed to drop it through the pipe then grab it with needle nose pliers through the small access hole at floor level. Hard as it might be to believe, this was a design and implementation triumph that I was mighty proud of since it was constructed only of odds and ends laying around the place.
The second wire on the left was required for the floor temperature sensor:
Another aspect of the floor heating needing attention is to do everything you can to make sure it works when it's embedded in the tile. The instructions indicate that you should use an ohmmeter to check the resistance in the heating and sensor circuits when you take it out of the box - they give you the expected ranges and a little table to fill out with results. Then you measure again after you've got in glued down to the floor and the wires routed. Then you check after the tile is in to insure that nothing has been damaged by the install process.
This activity was done with my arm in the sling, trying to avoid putting any weight on it which was mostly successful.
Zach, taking pity on the hobbled owner, made an offer to come over on the 19th and work on the floor tiles which was gladly accepted. I could help with mixing the thin-set, and cutting the end pieces, but he did most of the work. Before he got there I got the mud washed off the tiles and sorted out the ones that had flaws, then lined them up with the better side pointed in one direction:

I realized later that it would have been much smarter to embed those heating coils in a minimal layer of thin-set that would harden into a level surface all across the floor. That would have made the floor tile setting much easier since those teeth on the trowel are designed to give you an even height of material so the tiles end up flat. Because I didn't do that, the tiles above the heating pad settled higher than those on the edges and it took a lot of screwing around with a thick layer to get things even.

The fruits of Zach's labor:
FYI, I neglected to check the resistance of the heating system after this half of the tiles was complete. That would have been advisable.
A week later I was feeling confident enough in my shoulder to spend a day getting the rest of the tiles down, always trying to keep its movement minimal and not lean on it, mostly with success.
My nit picking of Zach's work melted away when I tried to do it! It was pretty hard to get all three dimensions of each tile aligned with the tiles around it... some compromises had to be made. His section was definitely superior to mine.
A couple days later I started on the grouting. The thin grout lines on the shower walls were much easier to deal with than the wide gaps on the floor. I started out trying to only put grout in the cracks and keep it off the face of the tile but had to give up on that idea.
So that meant a lot of sponging and changing out the buckets of water for clean stuff. The little section above was all I was could manage in a day. Back on May 2nd, that section was dry:
and below are the results of the day: another small section around the toilet. I prioritized that because the plumber was scheduled to come do the finish work on May 4, so the floor needed to be ready for the toilet to be installed.
BTW, still hadn't remembered to check the resistance on the heating coil.
And of course the plumber didn't come on the 4th. That gave me some more grout time, but it wasn't until he had come and gone, on the 19th of May that I finished the acid-on-toothbrush work to scrub the little bits out grout out of the red tile:
The final finish step was to apply sealer which added a nice gloss which I neglected to take a picture of.
As to all the ominous hints, sometime in the week before the toilet went in there I remembered the resistance test. I pulled out my fancy ohmmeter but it wasn't working. After dinking around with that for a while, I got out my old steady one, turned the dial to measure Ohms, and got nothing (i.e. infinite resistance)! The meter was working fine. Cursing and really pissed off, I dug into the sheetrock wall so I could access the wires closer to the floor and test them there. This involved cutting through the conduit and of course I damaged the insulation on one of the wires. While taking the new measurement I realized that I my expected measure was about 40000 ohms, but I had the meter dial sitting in course-grain mode, so it wasn't measuring it. Once I twisted the dial to the correct sensitivity I got the expected measure. All that upset and damage for nothing! It was a familiar experience from software engineering where sometimes the testing can be far buggier than the feature being tested. Nothing to do at that point but try to patch up that wire's insulation and get it all tucked away, leaving a scar in the sheetrock which will hopefully be covered by the base board when that goes in.
Bonus shot - the loading dock works!

No comments:
Post a Comment