One aspect of the design that was troubling me from the start was what to do about the shop floor. It needed to be stout enough to support the heavy machinery - the band saw weighs over 500 pounds. Machinery which can be mounted on wheels meaning the point stress is very high. Back when we built our house, for the sections that supported a heavy concrete pad and floor tiles we used 1¼" thick 4x8 sub-floor panels that were super heavy duty. Unfortunately the construction industry has changed and this material is not available. You can google it, you can still see it on the web sites for Home Depot etc, but the status is "Out of Stock". The thing that everyone carries and my man Michael at Summit Lumber recommended was the AdvanTech ¾" thick 4x8 T&G OSB sub-floor panels. This is a much improved product over previous generations of OSB (Oriented Strand Board, aka press-board), and is stronger that plywood of the same thickness. It seems to have swept everything else out of the market. So that went down on top of the trusses as you've seen in many photos in previous posts. But I felt the need to have another layer for greater strength.
An alternative which I used in Charla's studio is ¾" thick 4x8 tongue and groove A/B Southern Pine plywood which served as sub-floor and finish floor (light duty service). From my online searches that seemed to be unavailable too, until I saw a pile of it while strolling down the lumber aisle in Home Depot. It wasn't even that expensive as plywood goes these days, but was more like a B/C grade.
When I was talking to Brandon & family about doing the deck, it occurred to me that while they were on site I could get them to install the plywood on that floor. It was pretty clear to me that my back would not put up with taking a DIY approach on this one. So I asked David, Ryan's helper, if he wanted some extra work, he said yes and we scheduled a day to go down and pick up the plywood from that pile in Home Depot. I needed to pick up 35 sheets. Naturally I wanted to pick the best ones since I was going to varathane it and use it as the finish floor surface.
When we started picking though the pile I had the realization that this was not even close to the quality of the material I'd used on the studio. We had a cart for the good ones, and we started making two other piles in the aisle - one for "marginally acceptable" and one for complete rejects. One common reason for rejects was that the tongue milling was completely off-kilter. To wit: you would not be able to get two boards to mate together. Typically this was found on seriously warped panels. It took hours and going through every board they had to get the 35 I needed. Yes, we returned all the rejects from the aisle to the stack instead of leaving that trash out for the poor store guys to deal with.
Turns out each sheet of plywood weights around 60 pounds, so 35 sheets is 2,100 LBS. My truck is rated one ton, and this load had my the springs grounding out when I hit a bump in the road. So we drove home as gingerly as possible, especially slow up the driveway, and unloaded it into the garage the weekend before Brandon would come out to do the deck work. While they worked on the deck I made a clean sweep of everything off the floor, moving most of it to the garage:
Brandon and son wrestling with the plywood:


It took a day and half to screw the boards down, and they did a craftman's job, even though the material was fighting them the whole way.
After they were gone I broke out the old Makita belt sander and some wood putty and started trying to even up the worse misalignments. In the picture below the lighter edge under the extension cord shows where I'd been sanding.
After sanding, I bought a new floor paint applicator (a flat nap-covered board on a broom handle), and four 3 gallon cans of the MinWax polyurithane-for-floors ($$ cha-ching! $$) and put on two coats over the course of a few days. Keep in mind this was all before the shoulder surgery. The shop's floor is definitely rougher than the art studio, but its going to get heavy wear anyway so no need for perfection. All that said, that wood came out pretty pretty:
Moving on to the Garage floor.... You might be asking, "Robert, I thought your floor in the garage was a finished concrete slab which was already in full use to park cars all winter?" And that was the truth, and that pristine concrete slab was now filthy with oil stains, dirt brought in on tires and the stuff that melts out of your wheel well when you drive on salted snowy roads before you park. But a bug had been planted in my ear by John D, our coffee supplier and bike mechanic. In one of our extended chats I mentioned the concrete slab had been finished and he said "You'll want to put sealer on that. Maybe not right now, but before you put it into operation. And you need to add grit because the sealer alone will get dangerously slippery when water drips off your car. And Walmart sells the ideal fine grain sand for that." You see, John is from the cold climes of the upper midwest, and he has garage wisdom.
I knew I would have to bite the bullet, and I got the impetus to deal with it when I decided to host the Rotary Installation Dinner for my upcoming year as the Madison Rotary Club president in the garage. (The shop might be a prettier space for a meal but I was worried about access for the elderly --- getting up there was going to be a problem for some members.) The installation dinner was planned for Juneteenth (6/19) and before that I wanted to get that floor clean and the sealer applied, and the stink of the fresh sealer completely gone.
I shopped around and decided to buy the really good stuff - the Rust-Oleum EpoxyShield that ran about $500 for the material needed to do one coat. Got 50 LBS of super fine play sand from WalMart (only ended up needing about 5 LBS). I also bought some flexible crack sealer juice to put into the cut joints partitioning the floor.
Of course, over the course of the last six months that garage had become a repository for a whole lot of construction material, tools, etc. A total mess. So job number one was to get it empty. I loaded all the leftover siding lumber onto the truck and started moving everything else out. Just for fun (and motivation) I used the Strava App to track my activity.

That is pretty damn amusing - a five mile hike! The spaghetti lines on the map are the GPS track of my walking around, with the long tail below being loads taken to the barn. Most of the stuff was shuffled back up to the shop or the top floor, and the graph on the bottom shows the elevation change so each peak is a separate trip. The shop got some quick and dirty shelving to organize it all:

A couple days later on May 28 I worked on a thorough scrub of all crud brought in by vehicles:
Then applying the filler juice into the cut joints. Unfortunately my joint filling technique left a lot to be desired so I had to spend hours after it hardened with a rotary wire brush on my drill grinding the overflow off the floor surface because I wanted to make sure the EpoxyShield would adhere well.
The challenge for the final wash was hundreds of rolly-polly centipedes that kept crawling out from the cracks between the slab and the ICF wall. Must be moist in there. I kept sweeping them out the doors and they kept on coming!
Application day was May 31, and Charla helped out so I didn't stress my shoulder too much with the roller. I mixed and poured out the epoxy stuff and sprinkled handfuls of sand over it while she ran the roller.
Finished!

With that done I could focus on what was needed before the final inspection from the county building inspector. You'll notice from the lights in these pictures that by this time we'd got the electrical finished - that work is covered in the next post. The only remaining item was getting a banister in the stairwell as well as a railing around it's entrance to the top floor. With increasing age I've become more of a fan of stout banisters. (When I was a kid we would see how fast we could go down the 72 concrete steps on the way to school, frequently taking two at a time - it was a rush in both senses. Now I know how vital that grab bar can be in some situations.)
While visiting Rotarian friend Mike S, I noticed he had made a cool banister by mounting a 2x4 on end and milling a groove for the fingers to grab. In the first week of June, using some of the long pine planks from trees felled on site, I crafted my own rough version using basic router bits to round the top and groove the sides.

For the railing at the top of the stairway I bought some prefabricated outdoor deck railing from Home Depot and finished 4x4 posts.

You might notice in the picture above that where the railing hits the wall I inserted a ½ inch plywood spacer. This is to leave room for the eventual sheetrock which will cover the wall.
On Monday June 9 I called in an inspection for the following day.